Quality Policy

ISO CERTIFIED ON QUALITY

Our team is well aware off parameters to be ensured for various certifications required as per leed/ well certification:

  • SELECTION OF EQUIPMENT WITH HIGH COP AS PER LEED
  • CFC FREE REFRIGERANT FOR DX UNITS
  • LOW VOC ADHESIVE FOR INSULATION AND SEALANT
  • HIGH EFFICEINEY MOTORS IE3/IE4 AS PER SPECIFICATIONS
  • MERV14 & MERV 8 FILTERS UTALISATION FOR BETTER QUALITY OF AIR
  • AHUS WITH VFD CONTROL OR EC FAN
  • BUILDING FLUSHOUT AS PER LEED NORMS – 14000 CUBIC FT OF OUTDOOR AIR PER SQFT OF GROSS FLOOR AREA MAINTAINING INTERNAL TEMP BETWEEN 15 deg C to 27 Deg C with RH < 60%.
  • 30% MORE FRESH AIR THAN ASHRAE 62.1
  • PROVIDING MINIMUM OUTDOOR AIR INTAKE FLOW DEVICE
  • IAQ TESTING AS PER WELL/ LEED

QUALITY ASSURANCE TOOLS

SPECIFIC TOOL AND TACKLES PROPOSED FOR THE PROJECT

  • Drilling machine with dust collector
  • Anemometer
  • Psychrometer
  • Digital Tachometer
  • Laser guided tool for marking
  • Hydraulic trolley for shifting material
  • Flow hood for air balancing
  • Co2 meter
  • Sound level meter
  • Vibration meter
  • Infrared thermometer
  • Smoke Tester

BMS INTEGRATION CAPABILITIES

CHW AHU (TFA)/ Ventilation unit/ Inline fans

EC fan AHU’s /CSU’s are supplied with Controller compatible to communicate with BMS  Modbus/ Bacnet over IP.

CHW CSU

BMS communication shall be through Control box with in the unit.

SISW FAN WITH SCRUBBER

Electrical panel with Modbus/ Bacnet  over IP for remote ON/OFF operation through BMS

CHW /DUAL Fluid PAC

BMS communication shall be through in-built control panel with Modbus/Bacnet over IP

CO2 SILENT FANS

Common Electrical panel for multiple fans with Modbus/ Bacnet  over IP for remote ON/OFF operation through BMS

Scroll to Top